So what is the Construction Act?
The Construction Act is the name commonly used to describe the Housing Grants, Construction and Regeneration Act 1996 and amended by the Local Democracy, Economic Development and Construction Act 2009.
Within the Act, it contains a number of Sections (or headings); these cover the following:
In summary, this section sets out what is meant by a Construction Contract.
This section identifies descriptions of works which are classified as ‘construction operations’, which include many of the usual activities examples of which include:
Demolition;
Construction, as well as repair and maintenance;
Civil engineering activities such as earth moving, piling, tunnelling, structures and sea defences;
This section does include some exclusions such as operations associated with:
Drilling for oil or natural gas;
Extraction of minerals;
Steelwork associated with nuclear processing, power generation or water/effluent treatment; or processing of chemicals, food and drink;
Manufacture and delivery of building or engineering components and equipment.
Where construction work is carried out to an occupiers dwelling house or flat, the provisions of this Act do not apply.
This gives a Party to a Construction Contract the right to refer a dispute under the contract to adjudication and sets out the provisions that must be included within the Construction Contract.
If these provisions are not included or have not been complied with, then the adjudication provisions of the Scheme for Construction Contracts will apply.
Where the work is estimated to be 45 days or more, payment by instalments, stage payments or other periodic payments shall be made.
This requires the Construction Contract to include a mechanism for determining what payment is due and when. This section mentions the ‘due date’ but this not when payment is made and funds paid, these are to be made by the Final Date for Payment.
Again, if the Construction Contract does not include the provisions required, then the relevant provisions of the Scheme for Construction Contracts will apply.
These sections place a requirement on each Party to give a notice which details their payment breakdown and the basis of how it is calculated, these requirements should be included within the Construction Contract. In a similar manner, if the Construction Contract does not comply with these provisions, then the relevant provisions of the Scheme for Construction Contracts will apply.
This section requires the payer to make payment by the final date for payment. There is a provision to give a notice to pay less than the sum in the payment notice.
Where a payment has not been made, this section sets out the notice requirements to be given before suspending any work. Care needs to be taken when considering suspending work.
This section removes the payment term referred to as ‘paid when paid’ when payment if required from a third person before payment is made between the Parties. There a very limited number of occasions when this is still allowed, namely where the third person becomes insolvent.
For a full copy of the Construction Act 1996 and updated in 2009
For a full copy of the Scheme for Construction Contracts 1998 and 2011
NOTE: Always check your contract. The Scheme for Contruction Contracts relate to England, others available for other nations.
Contact us to discuss more about your particular dispute or dispute avoidance requirements:
Cookie | Duration | Description |
---|---|---|
cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |